THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.
As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.

For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.
During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.
Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion. , This news data comes from:http://kjbdcfj.erlvyiwan.com
- Pakistanis no reprieve from floods yet
- Marcos orders full budget review for DPWH amid ghost projects scandal
- Aftershocks rumble quake-hit Afghanistan as death toll tops 1,400
- Lacson lauds Leviste for arrest of DPWH engineer who offered P360M bribe
- Hontiveros wants Senate to probe Chinese who pretended to be Filipino
- DMW: 19 distressed OFWs return home from Jeddah
- No winner in lotto draws for Aug 23
- Major road closures in Manila announced for 2025 Bar Examinations
- SC orders comment on petitions vs polls
- LPA off Leyte has low chance of becoming cyclone within 24 hours —Pagasa